iLight Case Study: Lighting an Award-winning Bridge

The Hastings High Bridge in Hastings, Minnesota was advanced from a construction date of 2015 to a construction date of 2010. The result is a new signature bridge — a $120 million structure designed by Parsons Transportation, with bridge architecture

Tagged with: , , ,
Posted in Case Studies, Manufacturer


Featured Product


 

Featured Job

Sr Lighting Engineering Manager – System Engineering- Lamp -Automotive R&D Center

PNJ Search Group LLC -Plymouth, MI

Featured Job Listing